Hospitality Radar
Counted 21 Nov 20265,199 projects with a published source152 countries874 new signals in 30 daysProject intelligence for hotel suppliers

Hotel projects in Tanzania

Hospitality Radar follows 20 hotel projects in Tanzania, each with a published source, excluding renovations, pure residences and serviced apartments: 3 in vision, 5 in planning, 12 in construction. The overview is free. Names, teams and sources are in the files.

The project list is free with an account. A project file is 40 credits, about 13 to 26 € in a plan. Files and prices

Fig. 1Projects in Tanzania by phaseCounted 21 Nov 2026
Construction12
Planning5
Vision3
In the pipeline20

3 are being specified now and 6 are buying now, in the general window of all trades.

01

Specification and buying by trade

Estimate from the opening date or the phase and the usual lead times per trade, as of November 2026; counts of 1 or 2 show as "< 3".

A trade usually counts fewer projects than the general window at the top; these can count more, because their own window counts alone. They are listed below the figure.

Fig. 2Projects in Tanzania by tradeCounted 21 Nov 2026
TradeShareSpecifyingBuying now
Pre-opening & brand67
Fitness55
Flooring36
Switches & room controls36
Furniture35
Lighting35
Textiles & curtains35
Art< 36
Show all 23 trades
Interior fit-out< 36
Kitchens, bars & laundry< 36
Electronic locks & access< 35
Modular & bathroom pods< 35
IT, TV & AV< 35
Outdoor & landscape< 35
Beds & mattresses< 34
OS&E & tableware< 34
Doors & ironmongery< 34
Building services & energy< 34
Spa, pool & leisure< 34
Procurement & project management< 34
Facade & glazing< 3< 3
Elevators< 3< 3
Bathrooms & sanitaryware< 30
SpecifyingBuying now

Specification: Facade & glazing, Spa, pool & leisure, Fitness, Pre-opening & brand

Buying: Bathrooms & sanitaryware, Doors & ironmongery, Facade & glazing, Modular & bathroom pods, Elevators, Fitness, Pre-opening & brand, Procurement & project management

02

Openings and open roles

Projects with a dated opening. Counts of 1 or 2 show as "< 3". Projects without a public opening year (4) count by their phase. 2026 without a published month (5): 4 of them are in construction and may still open by year end; fewer than 3 are still in vision or planning, so their date will very likely move.

Counted projects in vision or planning whose file names no company for this role yet. Most hotel projects name their general contractor late or never in public, so that figure shows what is not public yet, not open tenders. Counts of 1 or 2 show as "< 3".

Fig. 3Openings by yearprojects
Rest of 2026< 3
2026, no month5
20278
2028< 3
20290
2030< 3
2031 or later0
Fig. 4Projects with an open rolevision and planning
Operator< 3
Architect5on the map
Interior design studio4on the map
General contractor8on the map
03

Cities and companies

No city in Tanzania has 5 or more projects yet.

Companies linked to the counted projects, by role. Counts of 1 or 2 show as "< 3". Names in the company files. "·" under "Based here": no company of this kind with its office in Tanzania in our data.

Fig. 5Companies by role
RoleOn projects hereBased here
Operators9·
Interior design studios8< 3
Developers and owners8< 3
Architects3< 3
Other companies< 3·
04

Files and prices

All prices

Project list
The project list is free with an account.
Project file
A project file is 40 credits: about 13 to 26 € in a plan, depending on plan and billing, 60 € without a plan.
City file
A city file is 4 credits per counted project (40 to 150).
Plans
Plans from 79 € a month billed yearly, 99 € billed monthly, with 150 credits a month.

The Radar Weekly

Every Monday: new signals, a city and a trade in numbers. Free, one click to leave.

See the 20 projects in Tanzania

Sign in with your company email to see every project with type, class, size range, opening date and where it stands for each trade.

20 projects in TanzaniaStart free