Hospitality Radar
Counted 21 Nov 20265,199 projects with a published source152 countries874 new signals in 30 daysProject intelligence for hotel suppliers

Hotel projects in the UAE

Hospitality Radar follows 115 hotel projects in the UAE, each with a published source, excluding renovations, pure residences and serviced apartments: 11 in vision, 34 in planning, 70 in construction. The overview is free. Names, teams and sources are in the files.

The project list is free with an account. A project file is 40 credits, about 13 to 26 € in a plan. Files and prices

Fig. 1Projects in the UAE by phaseCounted 21 Nov 2026
Construction70
Planning34
Vision11
In the pipeline115

26 are being specified now and 18 are buying now, in the general window of all trades.

01

Specification and buying by trade

Estimate from the opening date or the phase and the usual lead times per trade, as of November 2026; counts of 1 or 2 show as "< 3".

A trade usually counts fewer projects than the general window at the top; these can count more, because their own window counts alone. They are listed below the figure.

Fig. 2Projects in the UAE by tradeCounted 21 Nov 2026
TradeShareSpecifyingBuying now
Pre-opening & brand2319
Flooring2318
Art2018
Switches & room controls2018
Furniture2014
Lighting2014
Textiles & curtains2014
Fitness2014
Show all 23 trades
Procurement & project management2013
Spa, pool & leisure2012
Facade & glazing1919
Interior fit-out1818
Kitchens, bars & laundry1818
Electronic locks & access1714
IT, TV & AV1714
Outdoor & landscape1714
Doors & ironmongery1518
Building services & energy1512
Beds & mattresses1211
OS&E & tableware1211
Bathrooms & sanitaryware129
Modular & bathroom pods924
Elevators913
SpecifyingBuying now

Specification: Facade & glazing, Spa, pool & leisure, Fitness, Pre-opening & brand

Buying: Bathrooms & sanitaryware, Doors & ironmongery, Facade & glazing, Modular & bathroom pods, Elevators, Fitness, Pre-opening & brand, Procurement & project management

02

Openings and open roles

Projects with a dated opening. Counts of 1 or 2 show as "< 3". Projects without a public opening year (14) count by their phase. 2026 without a published month (22): 21 of them are in construction and may still open by year end; fewer than 3 are still in vision or planning, so their date will very likely move.

Counted projects in vision or planning whose file names no company for this role yet. Most hotel projects name their general contractor late or never in public, so that figure shows what is not public yet, not open tenders. Counts of 1 or 2 show as "< 3".

Fig. 3Openings by yearprojects
Rest of 20263
2026, no month22
202732
202820
202914
20308
2031 or later< 3
Fig. 4Projects with an open rolevision and planning
Operator7on the map
Architect18on the map
Interior design studio23on the map
General contractor39on the map
03

Cities and companies

9 of the 115 projects are in places with fewer than 5 projects and no city page of their own.

Companies linked to the counted projects, by role. Counts of 1 or 2 show as "< 3". Names in the company files. "·" under "Based here": no company of this kind with its office in the UAE in our data.

Fig. 5Cities with a city pageprojects
Fig. 6Companies by role
RoleOn projects hereBased here
Interior design studios6236
Operators4322
Developers and owners4152
Architects2413
Brands8< 3
Agencies< 3·
04

Files and prices

All prices

Project list
The project list is free with an account.
Project file
A project file is 40 credits: about 13 to 26 € in a plan, depending on plan and billing, 60 € without a plan.
City file
A city file is 4 credits per counted project (40 to 150).
Plans
Plans from 79 € a month billed yearly, 99 € billed monthly, with 150 credits a month.

The Radar Weekly

Every Monday: new signals, a city and a trade in numbers. Free, one click to leave.

See the 115 projects in the UAE

Sign in with your company email to see every project with type, class, size range, opening date and where it stands for each trade.

115 projects in the UAEStart free