Art for hotel projects
For art programmes, about 1,700 hotel projects are being specified right now, while the products are still being chosen, and about 910 are buying. A product that is already in the spec goes into the tender with the best odds.

The window for art
Hospitality Radar follows 5,199 hotel projects in vision, planning and construction, each with a published source, excluding renovations, pure residences and serviced apartments.
A project counts as being specified now when it is 24 to 15 months before opening, the time the choice for art programmes is usually made; it counts as buying now 11 to 6 months before opening.
hotel projects are in the specification window for art today.
When specification and buying start
Hotel projects entering specification and buying for art programmes, by quarter. Specification counts from next month, and its first four bars add up to the 255 at the top.
Estimate from each project's opening year and typical lead times for this trade. Later quarters fill up as new projects are announced, so a lower bar further out is not a falling market.
| Rest of Q4 2026 | 30 | |
| Q1 2027 | 85 | |
| Q2 2027 | 95 | |
| Q3 2027 | 45 | |
| Q4 2027 | 45 | |
| Q1 2028 | 45 | |
| Q2 2028 | 45 | |
| Q3 2028 | 10 |
| Q4 2026 | 300 | |
| Q1 2027 | 240 | |
| Q2 2027 | 220 | |
| Q3 2027 | 210 | |
| Q4 2027 | 140 | |
| Q1 2028 | 95 | |
| Q2 2028 | 85 | |
| Q3 2028 | 85 |
Where it is being specified right now
Cities with the most hotel projects being specified for this trade right now. The city overview opens with your trade on top.
| Europe | 670 | |
| Asia-Pacific | 550 | |
| North America | 370 | |
| Latin America | 140 | |
| Middle East | 130 | |
| Africa | 75 |
Projects being specified now or starting specification by the end of Q3 2027, by region: the 1,700 being specified now and the 255 starting by the end of Q3 2027, 1,955 together. The bars are rounded per region and leave out projects outside these regions, they add up to 1,935.
Europe609313
Middle East10976
Asia-Pacific458229
Latin America11386
Each region opens to its countries. Same rule as the figures at the top and the country and region pages: projects without an opening month count in part, rounded per country. Every country with its own country page (10 or more counted projects), by region. Counts of 1 or 2 show as "< 3".
What kind of hotels
Share of projects with a known class. Our coverage is strongest in upscale and luxury hotels; midscale and select-service projects are being added.
Branded residences count when they are part of a hotel project; pure residences without a hotel do not.
| Luxury | 45% | |
| Midscale and select-service | 20% | |
| Upscale | 15% | |
| Boutique | 10% | |
| Lifestyle | 8% | |
| Economy | 3% |
| Hotels | 87% | |
| Resorts | 10% | |
| Hotel and residences | 2% | |
| Branded residences | 1% |
The decision window
There are two ways into a project: through the specification or through the tender.
Specification can start up to 30 months before opening.
This page counts a project as specifying 24 to 15 months and as buying 11 to 6 months before opening. A product that is already in the spec goes into the tender with the best odds.
Art is specified either by the interior design studio directly or by a dedicated art consultant working alongside it, with purchasing routed through the owner's or operator's FF&E procurement process. International brand standards cover art more loosely than lighting or textiles, which leaves independent, boutique and soft-brand hotels with more freedom and gives art consultants a larger role on those projects.
Acting before a project's specification window closes puts a consultant or supplier ahead of the design brief rather than reacting to it.
What is changing in hotel projects
Four developments from the trade press, each with its source, and figures worth knowing.
- Art Consultants Join Design Teams Earlier
- Hotel operators increasingly bring in a dedicated art consultant alongside the interior design studio from early in the project rather than after the architecture is fixed. Budget and placement decisions move earlier as a result, with high-traffic zones such as corridor ends and lift lobbies planned from the start.Source: hoteldesigns.net
- Hotel Design Treated As Cultural Narrative
- Design media increasingly frame hotel interiors, including art, as a deliberate narrative reflecting a property's culture, history or mood rather than a late decorative layer. That framing pulls art decisions into the same early conversation as architecture and materials.Source: costar.com
- Local Artists Replace Generic Catalogue Prints
- Murals, sculpture, textiles and photography sourced from local artists are described as a new baseline for hotel public areas rather than a premium option. The shift favours projects willing to commission work tied to a specific place over standard catalogue art.Source: costar.com
- Museum Partnerships Elevate Luxury Art Programmes
- At least one global luxury hotel group now runs a recurring, museum-partnered art programme with newly commissioned work each edition. It signals that leading luxury brands treat art as an ongoing curatorial programme rather than a one-off installation at opening.Source: peninsula.com
| In the radar, specifying now by region: Europe 609, Middle East 109, Asia-Pacific 458, North America 339, Latin America 113, Africa 58. | Hospitality Radar, November 2026 |
| The installed package of artwork, mirrors and accessories in guestroom renovations averages around USD 1,145 per key. | Hotel Management, 2025 |
| Building, purchasing and installing a model guestroom, including its art and accessories, takes 4 to 6 months. | Hospitalitynet, 2025 |
| Hospitality design media now describe regional art, murals, sculpture, textiles and photography by local artists as a hallmark of intentional hotel design rather than a decorative add-on. | CoStar News Hospitality, 2025 |
| Hotel operators increasingly bring in a dedicated art consultant as a distinct link to the art world alongside the interior design studio, setting budget early and focusing placement on high-traffic zones such as corridor ends and lift lobbies. | Hotel Designs, 2025 |
| Specialist hospitality consultants, including design and FF&E-adjacent experts, largely operate through invitation-only networks such as the International Society of Hospitality Consultants, which counts more than 200 members across over 60 countries. | International Society of Hospitality Consultants, 2025 |
How the count works
Counted 21 Nov 2026. Figures are estimates, rounded, and recalculated with every update of the radar.
- Window of this trade
- Counted for art programmes: specification 24 to 15 and buying 11 to 6 months before opening (the part of this trade's window inside the general window). Buying counts from the month after specification ends.
- General window
- The general window of the home page: specification 24 to 12, buying 15 to 6 months.
- Projects without a date
- So many projects count because 3,455 of the 5,199 publish only an opening year and 958 in planning have none yet: they count in part or by their phase until a date is published. Projects without a public opening year count by their phase.
- Regions
- A region row counts all countries of the region, including those without a row of their own. DACH: Germany, Austria, Switzerland. Nordics: Denmark, Sweden, Norway, Finland, Iceland. Central and Eastern Europe: 16 countries from Poland to Albania, as on its region page. Gulf states: UAE, Saudi Arabia, Qatar, Oman, Bahrain, Kuwait.
- Prices
- The project list is free with an account. A project file is 40 credits: about 13 to 26 € in a plan, depending on plan and billing, 60 € without a plan. A city file is 4 credits per counted project (40 to 150), plans from 79 € a month billed yearly, 99 € billed monthly, with 150 credits a month. All prices
The Radar Weekly
Every Monday: new signals, a city and a trade in numbers. Free, one click to leave.
See the projects being specified for art programmes
Sign in with your company email to see every project with its class, size range, opening date and where it stands for art programmes: being specified or buying. Open the files you need for the studio, developer, operator and contacts.






