Facade & glazing for hotel projects
For facade, glazing and windows, about 1,340 hotel projects are being specified right now, while the products are still being chosen, and about 810 are buying. A product that is already in the spec goes into the tender with the best odds.

The window for facade & glazing
Hospitality Radar follows 5,199 hotel projects in vision, planning and construction, each with a published source, excluding renovations, pure residences and serviced apartments.
A project counts as being specified now when it is 42 to 28 months before opening, the time the choice for facade, glazing and windows is usually made; it counts as buying now 27 to 16 months before opening.
hotel projects are in the specification window for facade & glazing today.
When specification and buying start
Hotel projects entering specification and buying for facade, glazing and windows, by quarter. Specification counts from next month, and its first four bars add up to the 115 at the top.
Estimate from each project's opening year and typical lead times for this trade. Later quarters fill up as new projects are announced, so a lower bar further out is not a falling market.
| Rest of Q4 2026 | 15 | |
| Q1 2027 | 45 | |
| Q2 2027 | 45 | |
| Q3 2027 | 10 | |
| Q4 2027 | 10 | |
| Q1 2028 | 10 | |
| Q2 2028 | 15 | |
| Q3 2028 | 5 |
| Q4 2026 | 90 | |
| Q1 2027 | 85 | |
| Q2 2027 | 95 | |
| Q3 2027 | 45 | |
| Q4 2027 | 45 | |
| Q1 2028 | 45 | |
| Q2 2028 | 45 | |
| Q3 2028 | 10 |
Where it is being specified right now
Cities with the most hotel projects being specified for this trade right now. The city overview opens with your trade on top.
| Europe | 520 | |
| Asia-Pacific | 440 | |
| North America | 260 | |
| Latin America | 95 | |
| Middle East | 75 | |
| Africa | 60 |
Projects being specified now or starting specification by the end of Q3 2027, by region: the 1,340 being specified now and the 115 starting by the end of Q3 2027, 1,455 together. The bars are rounded per region and leave out projects outside these regions, they add up to 1,450.
Europe504212
Middle East6383
Asia-Pacific379249
Latin America8376
Each region opens to its countries. Same rule as the figures at the top and the country and region pages: projects without an opening month count in part, rounded per country. Every country with its own country page (10 or more counted projects), by region. Counts of 1 or 2 show as "< 3".
What kind of hotels
Share of projects with a known class. Our coverage is strongest in upscale and luxury hotels; midscale and select-service projects are being added.
Branded residences count when they are part of a hotel project; pure residences without a hotel do not.
| Luxury | 44% | |
| Midscale and select-service | 19% | |
| Upscale | 15% | |
| Boutique | 11% | |
| Lifestyle | 7% | |
| Economy | 3% |
| Hotels | 85% | |
| Resorts | 11% | |
| Hotel and residences | 2% | |
| Branded residences | 2% |
The decision window
There are two ways into a project: through the specification or through the tender.
Specification can start up to 42 months before opening.
This page counts a project as specifying 42 to 28 months and as buying 27 to 16 months before opening. A product that is already in the spec goes into the tender with the best odds.
The architect sets the facade's form within planning and zoning approval, while a specialist facade consultant engineers thermal, structural, fire and weathertightness performance; the facade is then procured either through a conventional tender after design is fixed, or via design-assist, where a facade contractor joins the design team early to lock cost and buildability in parallel with the architect's work. International brand design and construction standards mainly govern architectural style and material class rather than naming approved facade products, unlike furniture or textile categories.
Facade specification starts earlier than almost any other hotel trade, often more than three years before opening, so the design-assist contractor is often chosen before the tender. Suppliers who are specified by then have the better chances in the tender. Tracking the buying window directly instead of waiting for a public announcement closes that gap.
What is changing in hotel projects
Five developments from the trade press, each with its source, and figures worth knowing.
- Ageing curtain walls reclad while hotels stay open
- Owners of older city hotel towers are replacing decades-old curtain wall facades without closing the building, sequencing panel by panel removal and installation floor by floor to keep rooms in operation. One documented reclad of this kind cut the building's energy use by close to a fifth and introduced a top down installation method new to its market.Source: gensler.com
- Kinetic shading facades track the sun through the day
- Mechanically operated, geometrically complex shading panels that open and close as the sun moves are a documented facade strategy for cutting solar heat gain in hot climates, moving beyond fixed louvres. One well known installation uses more than 2,000 triangular panels to reduce solar heat gain by around half.Source: architecturelab.net
- Tightening energy codes raise the glazing performance floor
- Building codes in the UK and US are both moving to stricter minimum thermal performance for windows and curtain walls, with triple glazing becoming mandatory in the coldest US climate zones and English new build windows held to a 1.2 W per square metre kelvin U-value target from 2027. Facade specification increasingly has to document declared, project-specific performance rather than relying on generic benchmark figures.Source: bsigroup.com
- Semi-unitised systems cut install time, keep performance
- Facade manufacturers are bringing semi-unitised curtain wall systems to market that combine unitised-level thermal performance with the faster, screw-spline installation associated with simpler stick built systems. This directly targets the construction-schedule pressure that design-assist lead times already put on facade packages.Source: architectmagazine.com
- Parametric geometry replaces flat glazed facade planes
- Computational design tools are being used to generate faceted or lattice-like facade geometries calibrated to balance solar exposure, guest views and visual identity rather than a single flat glazed plane. This lets a facade team tune shading and daylight performance by zone instead of applying one uniform treatment across the whole building.Source: worldarchitecture.org
| In the radar, specifying now by region: Europe 504, Middle East 63, Asia-Pacific 379, North America 247, Latin America 83, Africa 51. | Hospitality Radar, November 2026 |
| England's updated building regulations keep the notional target U-value for new build windows with more than 60 percent glazing at 1.2 W per square metre kelvin, with the rules taking effect in March 2027 and now requiring declared performance for the actual installed product size rather than a standard benchmark size. | BSI Group, 2026 |
| The next edition of the main US commercial energy code tightens window and curtain wall U-factor limits by roughly 3 to 13 percent depending on climate zone and makes triple glazing mandatory in the coldest zones. | National Glass Association, 2025 |
| Industry guidance recommends engaging a design-assist facade contractor 20 to 24 months before the curtain wall needs to be ready for installation on site, well ahead of the general contractor's own procurement schedule. | BNP Media Continuing Education, 2025 |
| Standard stick built curtain wall systems currently carry lead times of 18 to 20 weeks, while unitised, factory assembled systems run to 26 to 30 weeks. | Building.co.uk, 2025 |
| A reclad of an ageing US hotel tower's curtain wall cut the building's energy use by close to 20 percent and was completed as the first top down curtain wall installation in the country, carried out while the hotel remained open. | Gensler, 2025 |
How the count works
Counted 21 Nov 2026. Figures are estimates, rounded, and recalculated with every update of the radar.
- Window of this trade
- Counted for facade, glazing and windows: specification 42 to 28 and buying 27 to 16 months before opening (this trade's own window, it barely overlaps the general window). Buying counts from the month after specification ends. Because its specification months (42 to 28) and buying months (27 to 16) lie mostly outside the general window (specification 24 to 12 and buying 15 to 6 months), the figure for facade, glazing and windows on a city, country or region page can be higher than the general one.
- General window
- The general window of the home page: specification 24 to 12, buying 15 to 6 months.
- Projects without a date
- So many projects count because 3,455 of the 5,199 publish only an opening year and 958 in planning have none yet: they count in part or by their phase until a date is published. Projects without a public opening year count by their phase.
- Regions
- A region row counts all countries of the region, including those without a row of their own. DACH: Germany, Austria, Switzerland. Nordics: Denmark, Sweden, Norway, Finland, Iceland. Central and Eastern Europe: 16 countries from Poland to Albania, as on its region page. Gulf states: UAE, Saudi Arabia, Qatar, Oman, Bahrain, Kuwait.
- Prices
- The project list is free with an account. A project file is 40 credits: about 13 to 26 € in a plan, depending on plan and billing, 60 € without a plan. A city file is 4 credits per counted project (40 to 150), plans from 79 € a month billed yearly, 99 € billed monthly, with 150 credits a month. All prices
The Radar Weekly
Every Monday: new signals, a city and a trade in numbers. Free, one click to leave.
See the projects being specified for facade, glazing and windows
Sign in with your company email to see every project with its class, size range, opening date and where it stands for facade, glazing and windows: being specified or buying. Open the files you need for the studio, developer, operator and contacts.


