Modular & bathroom pods for hotel projects
For volumetric modules and bathroom pods, about 1,170 hotel projects are being specified right now, while the products are still being chosen, and about 1,260 are buying. A product that is already in the spec goes into the tender with the best odds.

The window for modular & bathroom pods
Hospitality Radar follows 5,199 hotel projects in vision, planning and construction, each with a published source, excluding renovations, pure residences and serviced apartments.
A project counts as being specified now when it is 24 to 22 months before opening, the time the choice for volumetric modules and bathroom pods is usually made; it counts as buying now 21 to 10 months before opening.
hotel projects are in the specification window for modular & bathroom pods today.
When specification and buying start
Hotel projects entering specification and buying for volumetric modules and bathroom pods, by quarter. Specification counts from next month, and its first four bars add up to the 200 at the top.
Estimate from each project's opening year and typical lead times for this trade. Later quarters fill up as new projects are announced, so a lower bar further out is not a falling market.
| Rest of Q4 2026 | 30 | |
| Q1 2027 | 80 | |
| Q2 2027 | 45 | |
| Q3 2027 | 45 | |
| Q4 2027 | 45 | |
| Q1 2028 | 35 | |
| Q2 2028 | 10 | |
| Q3 2028 | 10 |
| Q4 2026 | 220 | |
| Q1 2027 | 210 | |
| Q2 2027 | 140 | |
| Q3 2027 | 95 | |
| Q4 2027 | 85 | |
| Q1 2028 | 85 | |
| Q2 2028 | 65 | |
| Q3 2028 | 45 |
Where it is being specified right now
Cities with the most hotel projects being specified for this trade right now. The city overview opens with your trade on top.
| Europe | 510 | |
| Asia-Pacific | 380 | |
| North America | 270 | |
| Latin America | 85 | |
| Middle East | 75 | |
| Africa | 45 |
Projects being specified now or starting specification by the end of Q3 2027, by region: the 1,170 being specified now and the 200 starting by the end of Q3 2027, 1,370 together. The bars are rounded per region and leave out projects outside these regions, they add up to 1,365.
Europe470371
Middle East55114
Asia-Pacific298358
Latin America65122
Each region opens to its countries. Same rule as the figures at the top and the country and region pages: projects without an opening month count in part, rounded per country. Every country with its own country page (10 or more counted projects), by region. Counts of 1 or 2 show as "< 3".
What kind of hotels
Share of projects with a known class. Our coverage is strongest in upscale and luxury hotels; midscale and select-service projects are being added.
Branded residences count when they are part of a hotel project; pure residences without a hotel do not.
| Luxury | 42% | |
| Midscale and select-service | 20% | |
| Upscale | 15% | |
| Boutique | 13% | |
| Lifestyle | 7% | |
| Economy | 3% |
| Hotels | 87% | |
| Resorts | 10% | |
| Hotel and residences | 2% | |
| Branded residences | 1% |
The decision window
There are two ways into a project: through the specification or through the tender.
Specification can start up to 34 months before opening.
This page counts a project as specifying 24 to 22 months and as buying 21 to 10 months before opening. A product that is already in the spec goes into the tender with the best odds.
Developers, architects and the hotel brand's design standards decide early whether a project builds modular at all, since the choice fixes the structural grid; Marriott and Hilton act as franchisors that have cleared specific brands for modular construction. The actual manufacturing order for the volumetric modules and for the bathroom pods is placed later, usually by the general contractor or developer in coordination with the brand's architect, once the modular concept is locked.
1,170 projects are currently deciding whether to build modular, the point where brand standards and structural plans still leave room for supplier input.
What is changing in hotel projects
Five developments from the trade press, each with its source, and figures worth knowing.
- Labour Shortages Push Hotels Toward Modular
- Developers increasingly turn to modular and offsite construction as a direct response to shortages of skilled site trades, since more of the work shifts into a factory setting. One industry consultant frames the shift as close to inevitable, arguing there is no other way to solve the labour shortage at scale.Source: probuilder.com
- Brand Approval Outpaces Manufacturer Supply
- Marriott has cleared modular construction for seven of its brands, but its own developers still describe the number of qualified module manufacturers as insufficient to meet demand. The gap between brand-level approval and factory capacity remains a bottleneck for projects moving from specification to order.Source: bdcnetwork.com
- Mass Timber and Volumetric Modules Converge
- Hotel developers are combining CLT and mass-timber structures with volumetric modules and prefabricated bathroom pods to cut both carbon footprint and build time. A Candlewood Suites project built this way for the US Army finished 37 percent faster than conventional steel-framed comparables.Source: woodworksinnovationnetwork.org
- Steel Frames Win the Branded Bathroom
- Hotel specifiers increasingly choose steel-framed bathroom pods over GRP because the steel frame allows full ceramic tiling and later tile replacement that matches brand standards. GRP pods remain the lower-cost choice for room types built to a single repeated design, such as student housing.Source: constructionmanagement.co.uk
- Tight Urban Sites Explore Rooftop Modules
- Architects have proposed self-contained modular hotel rooms for leftover urban sites such as rooftops, car parks and gaps between buildings, with one concept winning a 2019 Radical Innovation Award. The idea remains a niche design exploration rather than a deployed building type, but it signals growing interest in using modules on sites too constrained for conventional construction.Source: bdcnetwork.com
| In the radar, specifying now by region: Europe 470, Middle East 55, Asia-Pacific 298, North America 239, Latin America 65, Africa 34. | Hospitality Radar, November 2026 |
| Modular construction can cut hotel build schedules by three to eight months compared with conventional methods, and one project in Hawthorne, California, cut roughly a year off its timeline. | Building Design+Construction, 2024 |
| Marriott has approved modular construction for seven of its brands, including Fairfield Inn, Courtyard, SpringHill Suites, TownePlace Suites, Four Points by Sheraton, AC Hotels and Moxy, yet its own development team still calls finding enough qualified module manufacturers a challenge. | Building Design+Construction, 2024 |
| Two mass-timber Candlewood Suites hotels built for the US Army at Fort Jackson were completed 37 percent faster than comparable projects using conventional light-gauge steel framing. | WoodWorks Innovation Network, 2026 |
| Prefabricated bathroom pods reach their best economies of scale on projects with more than 100 bathrooms, and well-specified pods can push the first bathroom refresh out to eight to 15 years after opening. | Hotel Management, 2024 |
| Median US hotel development costs reached about USD 213,000 per room in the 2026 survey year, rising above USD 1.6 million per key for luxury projects. | HVS, U.S. Hotel Development Cost Survey 2026, 2026 |
| Early engagement is the most critical factor in specifying bathroom pods, since moving bathroom construction into a factory setting can save as much as 20 weeks of programme time on a large project. | PBC Today, 2019 |
How the count works
Counted 21 Nov 2026. Figures are estimates, rounded, and recalculated with every update of the radar.
- Window of this trade
- Counted for volumetric modules and bathroom pods: specification 24 to 22 months before opening (the part of this trade's window inside the general window), buying 21 to 10 months (this trade's own window, it barely overlaps the general window). Buying counts from the month after specification ends. Because its buying months (21 to 10) lie mostly outside the general window (buying 15 to 6 months), the figure for volumetric modules and bathroom pods on a city, country or region page can be higher than the general one. The count covers 3 months of specification and 12 months of buying, so more projects are buying than being specified.
- General window
- The general window of the home page: specification 24 to 12, buying 15 to 6 months.
- Projects without a date
- So many projects count because 3,455 of the 5,199 publish only an opening year and 958 in planning have none yet: they count in part or by their phase until a date is published. Projects without a public opening year count by their phase.
- Regions
- A region row counts all countries of the region, including those without a row of their own. DACH: Germany, Austria, Switzerland. Nordics: Denmark, Sweden, Norway, Finland, Iceland. Central and Eastern Europe: 16 countries from Poland to Albania, as on its region page. Gulf states: UAE, Saudi Arabia, Qatar, Oman, Bahrain, Kuwait.
- Prices
- The project list is free with an account. A project file is 40 credits: about 13 to 26 € in a plan, depending on plan and billing, 60 € without a plan. A city file is 4 credits per counted project (40 to 150), plans from 79 € a month billed yearly, 99 € billed monthly, with 150 credits a month. All prices
The Radar Weekly
Every Monday: new signals, a city and a trade in numbers. Free, one click to leave.
See the projects being specified for volumetric modules and bathroom pods
Sign in with your company email to see every project with its class, size range, opening date and where it stands for volumetric modules and bathroom pods: being specified or buying. Open the files you need for the studio, developer, operator and contacts.