Elevators for hotel projects
For elevators and escalators, about 1,170 hotel projects are being specified right now, while the products are still being chosen, and about 600 are buying. A product that is already in the spec goes into the tender with the best odds.

The window for elevators
Hospitality Radar follows 5,199 hotel projects in vision, planning and construction, each with a published source, excluding renovations, pure residences and serviced apartments.
A project counts as being specified now when it is 24 to 22 months before opening, the time the choice for elevators and escalators is usually made; it counts as buying now 21 to 14 months before opening.
hotel projects are in the specification window for elevators today.
When specification and buying start
Hotel projects entering specification and buying for elevators and escalators, by quarter. Specification counts from next month, and its first four bars add up to the 170 at the top.
Estimate from each project's opening year and typical lead times for this trade. Later quarters fill up as new projects are announced, so a lower bar further out is not a falling market.
| Rest of Q4 2026 | 35 | |
| Q1 2027 | 45 | |
| Q2 2027 | 45 | |
| Q3 2027 | 45 | |
| Q4 2027 | 45 | |
| Q1 2028 | 10 | |
| Q2 2028 | 10 | |
| Q3 2028 | 10 |
| Q4 2026 | 230 | |
| Q1 2027 | 90 | |
| Q2 2027 | 90 | |
| Q3 2027 | 85 | |
| Q4 2027 | 95 | |
| Q1 2028 | 45 | |
| Q2 2028 | 45 | |
| Q3 2028 | 45 |
Where it is being specified right now
Cities with the most hotel projects being specified for this trade right now. The city overview opens with your trade on top.
| Europe | 500 | |
| Asia-Pacific | 380 | |
| North America | 260 | |
| Latin America | 80 | |
| Middle East | 70 | |
| Africa | 45 |
Projects being specified now or starting specification by the end of Q3 2027, by region: the 1,170 being specified now and the 170 starting by the end of Q3 2027, 1,340 together. The bars are rounded per region and leave out projects outside these regions, they add up to 1,335.
Europe470156
Middle East5561
Asia-Pacific298181
Latin America6555
Each region opens to its countries. Same rule as the figures at the top and the country and region pages: projects without an opening month count in part, rounded per country. Every country with its own country page (10 or more counted projects), by region. Counts of 1 or 2 show as "< 3".
What kind of hotels
Share of projects with a known class. Our coverage is strongest in upscale and luxury hotels; midscale and select-service projects are being added.
Branded residences count when they are part of a hotel project; pure residences without a hotel do not.
| Luxury | 42% | |
| Midscale and select-service | 20% | |
| Upscale | 15% | |
| Boutique | 13% | |
| Lifestyle | 7% | |
| Economy | 3% |
| Hotels | 87% | |
| Resorts | 10% | |
| Hotel and residences | 2% | |
| Branded residences | 1% |
The decision window
There are two ways into a project: through the specification or through the tender.
Specification can start up to 36 months before opening.
This page counts a project as specifying 24 to 22 months and as buying 21 to 14 months before opening. A product that is already in the spec goes into the tender with the best odds.
The architect or a dedicated vertical transportation consultant sets car count, capacity, speed and type early in design, with brand standards from operators such as Marriott, Hilton, Accor, IHG and Hyatt setting minimum technical requirements. Procurement runs through the general contractor or owner, typically via a tender with a shortlist of three to four manufacturers.
Elevator shafts are fixed early in the structural design, so the specification takes shape long before the tender. Suppliers who are specified early have the better chances in the tender.
What is changing in hotel projects
Four developments from the trade press, each with its source, and figures worth knowing.
- Modernisation Overtakes New Installations as Growth Engine
- Across the elevator industry, service and modernisation now generate higher margins than new equipment and are growing faster, driven by an ageing installed base. For hotel owners this means more renovation-driven elevator spend relative to ground-up new builds over the coming cycle.Source: rolandberger.com
- Asia and Gulf Region Lead Modernisation Growth
- Modernisation demand is expanding fastest in Asia and in the Middle East and Africa, regions with large stocks of ageing high-rise buildings including hotel towers. Suppliers active in these regions can expect retrofit and upgrade volumes to grow faster than the global average.Source: rolandberger.com
- Glass and Panoramic Cabs as a Lobby Design Statement
- Manufacturers now position glass and panoramic lift cars explicitly for hotel, retail and commercial lobbies, built to make a visible architectural statement rather than serve as plain circulation. This pushes cab design and finish into a separate, later decision from the core technical specification.Source: stannahlifts.co.uk
- Service Backlogs Signal a Multi-Year Replacement Cycle
- Otis reported its modernisation order backlog at a record high and up sharply year on year, which points to a multi-year replacement cycle rather than a short-term bump. Suppliers can plan outreach around renovation pipelines with more confidence than in a one-off upgrade wave.Source: s203.q4cdn.com
| In the radar, specifying now by region: Europe 470, Middle East 55, Asia-Pacific 298, North America 239, Latin America 65, Africa 34. | Hospitality Radar, November 2026 |
| The global elevator and escalator market was valued at around USD 107 billion in 2024 and is projected to grow by roughly one third by 2030. | Roland Berger, 2025 |
| Modernisation is forecast to grow fastest in Asia, at an 11% compound annual growth rate between 2024 and 2030, with the Middle East and Africa also expanding strongly. | Roland Berger, 2025 |
| Otis Worldwide reported a 43% year-on-year jump in modernisation orders in the fourth quarter of 2025, lifting its service backlog to a record and confirming that modernisation margins now exceed those of new equipment. | Otis Worldwide Q4 2025 Earnings Release, 2026 |
| Mordor Intelligence estimates the global elevator and escalator market at USD 136.3 billion for 2026, a figure built on a disclosed top-down methodology rather than a single-number teaser. | Mordor Intelligence, 2026 |
How the count works
Counted 21 Nov 2026. Figures are estimates, rounded, and recalculated with every update of the radar.
- Window of this trade
- Counted for elevators and escalators: specification 24 to 22 months before opening (the part of this trade's window inside the general window), buying 21 to 14 months (this trade's own window, it barely overlaps the general window). Buying counts from the month after specification ends. Because its buying months (21 to 14) lie mostly outside the general window (buying 15 to 6 months), the figure for elevators and escalators on a city, country or region page can be higher than the general one.
- General window
- The general window of the home page: specification 24 to 12, buying 15 to 6 months.
- Projects without a date
- So many projects count because 3,455 of the 5,199 publish only an opening year and 958 in planning have none yet: they count in part or by their phase until a date is published. Projects without a public opening year count by their phase.
- Regions
- A region row counts all countries of the region, including those without a row of their own. DACH: Germany, Austria, Switzerland. Nordics: Denmark, Sweden, Norway, Finland, Iceland. Central and Eastern Europe: 16 countries from Poland to Albania, as on its region page. Gulf states: UAE, Saudi Arabia, Qatar, Oman, Bahrain, Kuwait.
- Prices
- The project list is free with an account. A project file is 40 credits: about 13 to 26 € in a plan, depending on plan and billing, 60 € without a plan. A city file is 4 credits per counted project (40 to 150), plans from 79 € a month billed yearly, 99 € billed monthly, with 150 credits a month. All prices
The Radar Weekly
Every Monday: new signals, a city and a trade in numbers. Free, one click to leave.
See the projects being specified for elevators and escalators
Sign in with your company email to see every project with its class, size range, opening date and where it stands for elevators and escalators: being specified or buying. Open the files you need for the studio, developer, operator and contacts.



