Hospitality Radar
Counted 21 Nov 20265,199 projects with a published source152 countries874 new signals in 30 daysProject intelligence for hotel suppliers

Switches & room controls for hotel projects

For switches, sockets, keycard and guest room controls, about 1,760 hotel projects are being specified right now, while the products are still being chosen, and about 910 are buying. A product that is already in the spec goes into the tender with the best odds.

The project list is free with an account. All prices

Material samples for switches & room controls in hotel projects
Illustration
01

The window for switches & room controls

Hospitality Radar follows 5,199 hotel projects in vision, planning and construction, each with a published source, excluding renovations, pure residences and serviced apartments.

A project counts as being specified now when it is 20 to 12 months before opening, the time the choice for switches, sockets, keycard and guest room controls is usually made; it counts as buying now 11 to 6 months before opening.

How the count works

1,760

hotel projects are in the specification window for switches & room controls today.

Fig. 1Projects by months before openingCounted 21 Nov 2026
42363024181260
1,760Specification
910 Buying
months before openingopening
Specification, 20 to 12 months · 1,760Buying, 11 to 6 months · 910
520start specification by the end of Q3 2027
53%with an international brand
02

When specification and buying start

Hotel projects entering specification and buying for switches, sockets, keycard and guest room controls, by quarter. Specification counts from next month, and its first four bars add up to the 520 at the top.

Estimate from each project's opening year and typical lead times for this trade. Later quarters fill up as new projects are announced, so a lower bar further out is not a falling market.

Fig. 2Entering specificationby quarter
Rest of Q4 202675
Q1 2027210
Q2 2027140
Q3 202795
Q4 202785
Q1 202885
Q2 202865
Q3 202845
Fig. 3Entering buyingby quarter
Q4 2026370
Q1 2027350
Q2 2027230
Q3 2027220
Q4 2027210
Q1 2028190
Q2 202895
Q3 202885
03

Where it is being specified right now

Cities with the most hotel projects being specified for this trade right now. The city overview opens with your trade on top.

All cities

Fig. 5By region, now and by the end of Q3 2027rounded
Europe780
Asia-Pacific640
North America430
Latin America170
Middle East160
Africa90

Projects being specified now or starting specification by the end of Q3 2027, by region: the 1,760 being specified now and the 520 starting by the end of Q3 2027, 2,280 together. The bars are rounded per region and leave out projects outside these regions, they add up to 2,270.

Fig. 6By region and country64 countries, counted 21 Nov 2026

Each region opens to its countries. Same rule as the figures at the top and the country and region pages: projects without an opening month count in part, rounded per country. Every country with its own country page (10 or more counted projects), by region. Counts of 1 or 2 show as "< 3".

04

What kind of hotels

Share of projects with a known class. Our coverage is strongest in upscale and luxury hotels; midscale and select-service projects are being added.

Branded residences count when they are part of a hotel project; pure residences without a hotel do not.

Fig. 7By classshare of projects
Luxury44%
Midscale and select-service20%
Upscale15%
Boutique9%
Lifestyle8%
Economy3%
Fig. 8By typeshare of projects
Hotels87%
Resorts10%
Hotel and residences2%
Branded residences2%
05

The decision window

There are two ways into a project: through the specification or through the tender.

Specification can start up to 20 months before opening.

This page counts a project as specifying 20 to 12 months and as buying 11 to 6 months before opening. A product that is already in the spec goes into the tender with the best odds.

The interior architect sets the colour, shape and finish of switch and socket plates, while the MEP or electrical consultant translates this into a technical specification covering load requirements, wiring type and GRMS integration. Brand standards from international hotel groups mainly fix the technical system choice, pushing buyers toward GRMS-capable suppliers, while independent and design-led hotels keep more freedom over the switch manufacturer itself.

Guest room control decisions are typically locked in well before first fix, while the switches, sockets and GRMS hardware itself ships closer to second fix and opening. Suppliers who track both moments see a project's buying window before a tender is issued.

06

What is changing in hotel projects

Five developments from the trade press, each with its source, and figures worth knowing.

Keyless entry edges out the keycard switch
Hotel brands are extending guest room access and control beyond the physical keycard, moving toward smartphone-based keyless entry and presence sensing. That undercuts the old insert-the-card-for-power trigger that classic key card switches depend on.Source: mews.com
In-room tablets bundle switch functions
In-room tablets increasingly bundle lighting, climate, curtain and do-not-disturb control alongside the conventional wall switch, as seen in Interel's integration with SuitePad guest tablets. Wall switches remain standard in entry-level rooms, but the tablet is becoming the primary control surface in higher segments.Source: tageskarte.io
Matt black and metal replace white plates
Design-led switch ranges in matt black, brushed metal and bespoke finishes are replacing plain white plates in hotel guest rooms. Manufacturers such as Hamilton Litestat and Wandsworth have both expanded their finish ranges specifically for hospitality projects.Source: hoteldesigns.net
USB-C sockets become the bedside standard
USB-C fast-charging outlets, supporting up to 100W and 10Gbps data transfer, are becoming standard alongside or in place of USB-A sockets at bedside positions. Suppliers now pair USB-C with conventional switch ranges rather than selling it as a separate accessory.Source: hoteldesigns.net
GRMS platforms consolidate under larger groups
Guest room control technology is consolidating under larger building technology groups. Siemens has brought Interel's ecosystem into its Smart Infrastructure business, while Honeywell has extended its INNCOM platform with INNcontrol 5 for full-property energy and guestroom management.Source: siemens.com
Fig. 9Numbers worth knowingwith source and year
In the radar, specifying now by region: Europe 646, Middle East 105, Asia-Pacific 467, North America 343, Latin America 121, Africa 64.Hospitality Radar, November 2026
HITEC 2026 in San Antonio sold out its exhibition floor with more than 400 exhibiting companies and drew more than 6,100 hospitality technology professionals.Hospitality Upgrade, 2026
Siemens has brought Interel's Hotel of Things guest room management ecosystem into its Smart Infrastructure business, marketed under the Interel IO brand.Siemens, 2026
Honeywell states that an energy management system integrated with guest room controls can cut a hotel property's energy costs by 35 to 45 percent, with a potential return on investment of 50 to 75 percent.Lodging Magazine, 2025
ABB's hotel guest room specification guidance recommends that switches, sockets and data outlets come from the same supplier as the guest room management system, so that all finishes in the room match.ABB, Specification Hotel Guest Room Basic, 2025
07

How the count works

Counted 21 Nov 2026. Figures are estimates, rounded, and recalculated with every update of the radar.

Window of this trade
Counted for switches, sockets, keycard and guest room controls: specification 20 to 12 and buying 11 to 6 months before opening (the part of this trade's window inside the general window). Buying counts from the month after specification ends.
General window
The general window of the home page: specification 24 to 12, buying 15 to 6 months.
Projects without a date
So many projects count because 3,455 of the 5,199 publish only an opening year and 958 in planning have none yet: they count in part or by their phase until a date is published. Projects without a public opening year count by their phase.
Regions
A region row counts all countries of the region, including those without a row of their own. DACH: Germany, Austria, Switzerland. Nordics: Denmark, Sweden, Norway, Finland, Iceland. Central and Eastern Europe: 16 countries from Poland to Albania, as on its region page. Gulf states: UAE, Saudi Arabia, Qatar, Oman, Bahrain, Kuwait.
Prices
The project list is free with an account. A project file is 40 credits: about 13 to 26 € in a plan, depending on plan and billing, 60 € without a plan. A city file is 4 credits per counted project (40 to 150), plans from 79 € a month billed yearly, 99 € billed monthly, with 150 credits a month. All prices

The Radar Weekly

Every Monday: new signals, a city and a trade in numbers. Free, one click to leave.

See the projects being specified for switches, sockets, keycard and guest room controls

Sign in with your company email to see every project with its class, size range, opening date and where it stands for switches, sockets, keycard and guest room controls: being specified or buying. Open the files you need for the studio, developer, operator and contacts.

1,760 projects being specifiedStart free