Building services & energy for hotel projects
For HVAC, electrical, fire safety, energy and EV charging, about 1,460 hotel projects are being specified right now, while the products are still being chosen, and about 640 are buying. A product that is already in the spec goes into the tender with the best odds.

The window for building services & energy
Hospitality Radar follows 5,199 hotel projects in vision, planning and construction, each with a published source, excluding renovations, pure residences and serviced apartments.
A project counts as being specified now when it is 24 to 18 months before opening, the time the choice for HVAC, electrical, fire safety, energy and EV charging is usually made; it counts as buying now 11 to 8 months before opening.
hotel projects are in the specification window for building services & energy today.
When specification and buying start
Hotel projects entering specification and buying for HVAC, electrical, fire safety, energy and EV charging, by quarter. Specification counts from next month, and its first four bars add up to the 285 at the top.
Estimate from each project's opening year and typical lead times for this trade. Later quarters fill up as new projects are announced, so a lower bar further out is not a falling market.
| Rest of Q4 2026 | 30 | |
| Q1 2027 | 85 | |
| Q2 2027 | 90 | |
| Q3 2027 | 80 | |
| Q4 2027 | 45 | |
| Q1 2028 | 45 | |
| Q2 2028 | 45 | |
| Q3 2028 | 35 |
| Q4 2026 | 220 | |
| Q1 2027 | 210 | |
| Q2 2027 | 140 | |
| Q3 2027 | 95 | |
| Q4 2027 | 85 | |
| Q1 2028 | 85 | |
| Q2 2028 | 65 | |
| Q3 2028 | 45 |
Where it is being specified right now
Cities with the most hotel projects being specified for this trade right now. The city overview opens with your trade on top.
| Europe | 620 | |
| Asia-Pacific | 490 | |
| North America | 330 | |
| Latin America | 120 | |
| Middle East | 110 | |
| Africa | 65 |
Projects being specified now or starting specification by the end of Q3 2027, by region: the 1,460 being specified now and the 285 starting by the end of Q3 2027, 1,745 together. The bars are rounded per region and leave out projects outside these regions, they add up to 1,735.
Europe546213
Middle East8653
Asia-Pacific388163
Latin America9163
Each region opens to its countries. Same rule as the figures at the top and the country and region pages: projects without an opening month count in part, rounded per country. Every country with its own country page (10 or more counted projects), by region. Counts of 1 or 2 show as "< 3".
What kind of hotels
Share of projects with a known class. Our coverage is strongest in upscale and luxury hotels; midscale and select-service projects are being added.
Branded residences count when they are part of a hotel project; pure residences without a hotel do not.
| Luxury | 44% | |
| Midscale and select-service | 20% | |
| Upscale | 15% | |
| Boutique | 10% | |
| Lifestyle | 8% | |
| Economy | 3% |
| Hotels | 87% | |
| Resorts | 10% | |
| Hotel and residences | 2% | |
| Branded residences | 1% |
The decision window
There are two ways into a project: through the specification or through the tender.
Specification can start up to 28 months before opening.
This page counts a project as specifying 24 to 18 months and as buying 11 to 8 months before opening. A product that is already in the spec goes into the tender with the best odds.
A specialised MEP engineering firm develops the load calculations, HVAC system selection and fire protection concept in parallel with the shell and core design, working closely with the architect and structural engineer. International brands such as Marriott and Hilton set binding minimum requirements in their design standards, for example VRF systems for individual room control or central chilled water plant on larger projects, electrical load requirements and water consumption standards. The owner or general contractor makes the actual equipment purchasing decision against these standards, usually through a tender to specialist trade contractors.
Chiller and refrigerant component lead times can stretch to a year, so the ordering window opens early. Suppliers who are specified by then have the better chances in the tender.
What is changing in hotel projects
Five developments from the trade press, each with its source, and figures worth knowing.
- Electrification Pressure Moves From Policy to Design Brief
- Brands with science-based emission targets increasingly name building electrification and the replacement of gas heating with heat pumps as a direct lever toward their 2030 and 2050 goals. New regulation in markets such as California now bans gas water heating in hospitality from 2030, pushing the same choice into design briefs earlier.Source: hospitalitynet.org
- Guest Room Management Gets an AI Layer
- The next generation of guest room management systems adds lightweight AI to interpret guest behaviour and optimise energy use, rather than simply switching lights and climate on preset schedules. ABB's 2026 launch of a purpose built hospitality GRMS signals that major automation vendors now treat hotel rooms as a distinct product category, not a generic building automation application.Source: new.abb.com
- EV Charging Becomes a Standard Amenity, Not an Option
- Major chains are rolling out EV charging at scale rather than on a case by case basis, with Hilton targeting up to 20,000 charge points at 2,000 hotels and IHG extending charger availability across its full US and Canada portfolio. For suppliers, this moves EV infrastructure from a discretionary add-on into a line item specified alongside core electrical design.Source: businesstraveller.com
- HVAC Lead Times Keep Buying Decisions Ahead of Schedule
- Regular manufacturing lead times for chillers and refrigerant circuit components run 8 to 12 weeks, but constrained categories have stretched toward a year in 2025 and 2026. For critical HVAC components the ordering window opens early, and suppliers who are specified by then have the better chances in the tender.Source: servicetitan.com
- Renovation-Driven MEP Demand Follows a Predictable Cycle
- Property Improvement Plans with HVAC, electrical or lighting scope recur roughly every 7 to 12 years and must be completed within 12 to 24 months of being issued, often phased so electrical and fire protection work precedes HVAC replacement. That cadence gives suppliers a repeatable signal for renovation-driven MEP demand, distinct from the new-build pipeline.Source: hotel-online.com
| In the radar, specifying now by region: Europe 546, Middle East 86, Asia-Pacific 388, North America 296, Latin America 91, Africa 47. | Hospitality Radar, November 2026 |
| Marriott International has had both its near-term and long-term emission reduction targets approved by the Science Based Targets initiative, committing to net-zero value chain greenhouse gas emissions by no later than 2050 and a 90% reduction from 2019 levels, with building electrification named as one of the decarbonisation levers. | Hospitality Net / SBTi coverage, 2025 |
| Hilton agreed with Tesla to install up to 20,000 EV charging points across 2,000 hotels in the US, Canada and Mexico, creating what Hilton describes as the largest overnight EV charging network of any hospitality company. | Business Traveller, 2025 |
| IHG Hotels & Resorts agreed with EnviroSpark to make EV chargers available to all IHG-branded hotels across the United States and Canada, extending a network that already covers more than 1,100 IHG hotels globally. | Journal des Palaces, 2025 |
| ABB unveiled GuestFlow, a purpose built end to end guest room management system for hotels, at Light+Building 2026, combining in-room control panels, control modules and GRMS software in a single vendor ecosystem. | ABB, 2026 |
| HVAC equipment pricing is projected to rise 10 to 12% in 2026, driven by elevated demand and continued supply constraints on compressors and refrigerant-specific components. | ServiceTitan, 2026 |
| Franchisors typically issue a Property Improvement Plan every 7 to 12 years and require owners to complete the required work within 12 to 24 months of receiving it. | Hotel-Online, 2025 |
How the count works
Counted 21 Nov 2026. Figures are estimates, rounded, and recalculated with every update of the radar.
- Window of this trade
- Counted for HVAC, electrical, fire safety, energy and EV charging: specification 24 to 18 and buying 11 to 8 months before opening (the part of this trade's window inside the general window). Buying counts from the month after specification ends.
- General window
- The general window of the home page: specification 24 to 12, buying 15 to 6 months.
- Projects without a date
- So many projects count because 3,455 of the 5,199 publish only an opening year and 958 in planning have none yet: they count in part or by their phase until a date is published. Projects without a public opening year count by their phase.
- Regions
- A region row counts all countries of the region, including those without a row of their own. DACH: Germany, Austria, Switzerland. Nordics: Denmark, Sweden, Norway, Finland, Iceland. Central and Eastern Europe: 16 countries from Poland to Albania, as on its region page. Gulf states: UAE, Saudi Arabia, Qatar, Oman, Bahrain, Kuwait.
- Prices
- The project list is free with an account. A project file is 40 credits: about 13 to 26 € in a plan, depending on plan and billing, 60 € without a plan. A city file is 4 credits per counted project (40 to 150), plans from 79 € a month billed yearly, 99 € billed monthly, with 150 credits a month. All prices
The Radar Weekly
Every Monday: new signals, a city and a trade in numbers. Free, one click to leave.
See the projects being specified for HVAC, electrical, fire safety, energy and EV charging
Sign in with your company email to see every project with its class, size range, opening date and where it stands for HVAC, electrical, fire safety, energy and EV charging: being specified or buying. Open the files you need for the studio, developer, operator and contacts.